Slide 1 of 18 · ContentsWhat will we cover, and how do we use this deck?
TakeawayLearn the model, then play the climb to test yourself.
Practitioner Readiness Level
Should we build it?
PRL validates practitioner adoption intent and workflow integration before capital is committed to technical development.
Core principle · never skip a voice
Reading the model
New · launch presentation
The Townhouse: a guide to PRL →
The UKBT Institute launch deck from SlideForge, with speaker notes.
Using this deck
Learn · 17 slides
The complete PRL framework, chart by chart: scale, stakeholders, success criteria, gates and scoring.
Play · 10 gates
A short game: take an innovation up the Townhouse, spot the red flags and spend your runway on evidence that predicts adoption.
Ten gates, PRL 1 to PRL 9. Mistakes cost runway; streaks multiply your score.
Play the game →Notes
UKBT Institute · PRL Present · FORTRESS R&D · Contents · Slide 1 of 18
PRL Present · Walk through the PRL · Crisis · Lenses · Rules
Slide 2 of 18 · The problemWhy do technically viable innovations still fail?
TakeawayAsk “should we build it?” before “can we build it?”
01 · The crisis
Technically viable is not the same as adopted.
£50B
Annual UK business R&D investment, with stagnant real-term growth since 2018.
Stalled
High UK R&D project failure rates: many never reach production.
Unadopted
Significant adoption gaps despite technical viability in public-sector innovation.
The gap: technology push. Solutions are built for perceived needs, then practitioners won't adopt them.
02 · Three lenses
Readiness levels ask different questions.
Catches: Technical impossibility, eventually, through expensive experiments.
Catches: Business-model issues, eventually, through expensive market testing.
Catches: Technical, commercial, regulatory, operational and adoption failure modes at once, in weeks not years.
Governance rule
PRL must lead or equal TRL at all times.
This enforces practitioner pull over technology push.
03 · The method
Together they reduce innovation failure.
The power of PRL is the power of the Townhouse: a convening method that brings diverse expertise together to catch failures early.
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 2 of 18
PRL Present · Walk through the PRL · Floors · Levels · People
Slide 3 of 18 · The modelHow does a project move from problem to sector standard?
TakeawayFour floors, nine levels. Up only when practitioners validate.
01 · The building
You only take the elevator up when practitioners validate.
Who we bring together
Intentionally interdisciplinary: better technology emerges when diverse perspectives collide.
02 · Floor 1 · Knowledge Transfer & Discovery
Establishes the foundational requirement for all R&D: practitioner-validated problem identification. Prevents innovations built for perceived rather than actual needs.
Practitioner-Identified Problem
Is the problem practitioner-identified and operationally significant?
Ask Practitioner (Daily User): “Do you face this problem daily?”
Cohort-Validated Problem
Is this an industry-wide problem or localized pain point?
Ask Practitioners (Sector Cohort): “Is this a sector-wide problem or just your organisation?”
Pilot Commitment Validation
Will practitioners and domain experts commit time to solution development?
Ask Practitioners (Pilot Participants): “Will you commit 10+ hours over 2 weeks to test solutions?”
Economic Signal Validation
Have all ecosystem stakeholders been consulted across the value chain?
Ask Customer (Pays) + 12 Stakeholders: “Will you pay £X today to fix this?”
Stage gate
Every level needs evidence, a clear yes from the right person, and no unresolved red flags.
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 3 of 18
PRL Present · Walk through the PRL · PRL 1 → PRL 9
Slide 4 of 18 · The modelWhat does each readiness level prove, and who proves it?
TakeawayEvery level has one question, one right person and one red-flag answer.
FORTRESS stage
Collaborate · Knowledge Transfer & DiscoveryExperiment · Stress Test & ValidateBuild · Practitioner-Led & ResearchScale · Growth, Markets & Ecosystem| PRL | Core validation question | Primary evidence | Right person | Right question | Red-flag answer | Stage |
|---|---|---|---|---|---|---|
| 1 | Is the problem practitioner-identified and operationally significant? | 1-3 practitioners articulate top-3 pain | Practitioner (Daily User) | “Do you face this problem daily?” | Occasionally or Sometimes | CollaborateKnowledge Transfer & Discovery |
| 2 | Is this an industry-wide problem or localized pain point? | ≥10 practitioners across organisations confirm; sector mapping validates scope | Practitioners (Sector Cohort) | “Is this a sector-wide problem or just your organisation?” | Only 1-2 organisations face it | CollaborateKnowledge Transfer & Discovery |
| 2.5 | Will practitioners and domain experts commit time to solution development? | ≥5 practitioners commit scheduled time; LOI for pilot participation | Practitioners (Pilot Participants) | “Will you commit 10+ hours over 2 weeks to test solutions?” | Maybe later or If we have time | CollaborateKnowledge Transfer & Discovery |
| 3 | Have all ecosystem stakeholders been consulted across the value chain? | All 12 stakeholder voices validated; economic signal confirmed | Customer (Pays) + 12 Stakeholders | “Will you pay £X today to fix this?” | Let me think or After v2 | CollaborateKnowledge Transfer & Discovery |
| 4 | What technology innovation type is proposed and what baseline performance exists? | Tech classified; ≥70% task completion in analogue pilot | Supply Chain + Academics | “Can we source, build, deliver this reliably?” | Can't source materials or Impossible | ExperimentStress Test & Validate |
| 5 | Does technology demonstrate utility, impact, or originality in real-world conditions? | Measurable workflow impact; practitioners validate usefulness | Practitioner (Daily User) | “Does this save you 2+ hours per week?” | Maybe or I'd try it | ExperimentStress Test & Validate |
| 6 | Can innovation withstand multi-stakeholder adversarial testing? | NPS ≥80; TVR ≥10; cross-sector stress test passed | Frontline Operator + Market | “Would you fight to keep this tool?” | Silence, shrugs, or It's okay | ExperimentStress Test & Validate |
| 7 | Can innovator demonstrate documented practitioner impact? | ≥1 peer-reviewed case study; academic validation | Internal Champion | “Does your team need this yesterday to win?” | Nice to have or Eventually | BuildPractitioner-Led & Research |
| 8 | Will practitioners sustain adoption beyond proof-of-concept? | ≥100 users; 90% retention; 30% referral; week-long operational trial | Community (Peer Network) | “Would you recommend this to peers?” | <30% referral rate | ScaleGrowth & Markets |
| 9 | Has innovation achieved commercial validation and sector adoption? | ≥1 paying customer with contract; community of practice; policy influence | Market + Customer | “Is this becoming sector standard?” | No ecosystem effects visible | ScalePromotion & Ecosystem |
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 4 of 18
PRL Present · Walk through the PRL · TRL · CRL · PRL
Slide 5 of 18 · The modelHow does PRL relate to TRL and CRL?
TakeawayTRL: can we build it? CRL: will someone pay? PRL: should we build it?
TRL
Lab testing (12–18 months)
“Can we build it?”
CRL
Market testing (6–12 months)
“Will someone pay?”
PRL
Multi-stakeholder review (1–4 weeks)
“Should we build it? Will practitioners use it?”
| Level | TRL · Technology | CRL · Commercial | PRL · Practitioner | Stage |
|---|---|---|---|---|
| 1 | Basic principles observed | Hypothetical commercial proposition | Practitioner-Identified Problem1-3 practitioners articulate top-3 pain | collaborate |
| 2 | Technology concept formulated | Commercial proposition formulated | Cohort-Validated Problem≥10 practitioners across organisations confirm; sector mapping validates scope | collaborate |
| 2.5 | — | — | Pilot Commitment Validation≥5 practitioners commit scheduled time; LOI for pilot participation | collaborate |
| 3 | Experimental proof of concept | Applied research based on market reality | Economic Signal ValidationAll 12 stakeholder voices validated; economic signal confirmed | collaborate |
| 4 | Technology validated in lab | Small-scale pilot commercially valid | Analogue Solution EfficacyTech classified; ≥70% task completion in analogue pilot | experiment |
| 5 | Technology validated in relevant environment | Large-scale pilot commercially validated | Digital Prototype Workflow IntegrationMeasurable workflow impact; practitioners validate usefulness | experiment |
| 6 | Technology demonstrated in relevant environment | Commercial trial with repeat customers | Immediate Switch ValidationNPS ≥80; TVR ≥10; cross-sector stress test passed | experiment |
| 7 | System prototype in operational environment | Commercial launch with market traction | Champion Advocacy & Mobilisation≥1 peer-reviewed case study; academic validation | build |
| 8 | System complete and qualified | Scaling product/business | Operational Embedding≥100 users; 90% retention; 30% referral; week-long operational trial | scale |
| 9 | System proven in operational environment | Sustainable business model proven | Sector Standard & Ecosystem Transformation≥1 paying customer with contract; community of practice; policy influence | scale |
PRL 2.5 has no TRL or CRL equivalent: pilot commitment is unique to practitioner readiness.
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 5 of 18
PRL Present · Walk through the PRL · Collaborate · Experiment · Build · Scale
Slide 6 of 18 · The methodWhat happens in each phase, and what counts as success?
TakeawayEach phase has one rule, its own red flags and a rising gate score.
Phase 1 · PRL 1–3
Collaborate
Knowledge Transfer & Discovery
Core rule
“Never skip a voice”
Action
Validation questions
Red flags = kill
Success signal
Gate score
≥60/100
Phase 2 · PRL 4–6
Experiment
Stress Test & Validate
Core rule
“Test simple before tech”
Action
Validation questions
Red flags = kill
Success signal
Gate score
≥80/100
Phase 3 · PRL 7
Build
Practitioner-Led & Research
Core rule
“Co-create, don't dictate”
Action
Validation questions
Red flags = kill
Success signal
Gate score
≥90/100
Phase 4 · PRL 8–9
Scale
Growth & Markets / Promotion & Ecosystem
Core rule
“Share everything”
Action
Validation questions
Red flags = kill
Success signal
Gate score
≥90/100 + 7% WoW
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 6 of 18
PRL Present · Walk through the PRL · 12 voices × 9 levels
Slide 7 of 18 · The voicesWhich voices validate at which level?
TakeawayNever skip a voice: all 12 validate by PRL 3.
01 · Activity map
Select a stakeholder to see their question. Filled = active at that level; ringed = the gate's right person.
| Stakeholder | 1 | 2 | 2.5 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
|---|---|---|---|---|---|---|---|---|---|---|
| Active, right person | Active, right person | Active, right person | Not active | Not active | Active, right person | Active, right person | Not active | Active | Not active | |
| Not active | Not active | Not active | Active, right person | Not active | Not active | Not active | Not active | Not active | Active, right person | |
| Active | Not active | Not active | Not active | Active, right person | Not active | Not active | Not active | Not active | Not active | |
| Not active | Not active | Not active | Not active | Active, right person | Active | Not active | Not active | Not active | Not active | |
| Not active | Not active | Not active | Not active | Not active | Not active | Active | Active, right person | Not active | Not active | |
| Not active | Not active | Not active | Active | Not active | Not active | Active, right person | Not active | Not active | Active, right person | |
| Not active | Not active | Not active | Active | Not active | Not active | Not active | Not active | Not active | Not active | |
| Not active | Not active | Not active | Active | Not active | Not active | Not active | Not active | Active | Not active | |
| Not active | Not active | Not active | Active | Not active | Not active | Not active | Not active | Not active | Not active | |
| Active | Not active | Not active | Not active | Active | Active | Not active | Not active | Not active | Not active | |
| Not active | Not active | Not active | Not active | Not active | Active | Active | Not active | Active | Not active | |
| Not active | Not active | Not active | Not active | Not active | Not active | Not active | Not active | Active, right person | Active |
At PRL 3 every voice must validate, active or not (“never skip a voice”). Dashed = consulted at PRL 3 only.
01 · Daily End Users
Practitioners
“Do you face this problem daily?”
02 · Real-world examples
Practitioner (Daily user): “Does this save you 2+ hours a week?”
Red flags: “Maybe”, “I'd try it”
If practitioners can't definitively say yes, the problem isn't urgent enough.
Customer (Pays): “Will you pay £X today to fix this?”
Red flags: “Let me think”, “After v2”
Delayed payment signals low urgency or a misaligned value proposition.
Frontline operator (End user): “Would you fight to keep this tool?”
Red flags: “Silence”, “Shrugs”
If operators won't advocate for the tool, adoption will fail.
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 7 of 18
PRL Present · Walk through the PRL · Evidence · Mechanisms · Failures · Gate
Slide 8 of 18 · The gatesWhat exactly must be true to pass each level?
TakeawayEvidence, not opinion, moves a project up.
01 · Success criteria
Is the problem articulated by practitioners in their operational context?
Right person · Practitioner (Daily User)
“Do you face this problem daily?”
Red-flag answer: Occasionally or Sometimes
02 · How the Townhouse helps
The convening activities that generate the evidence.
Knowledge Transfer Roundtables
Structured problem surfacing sessions convening cross-sector practitioners (NHS clinicians, teachers, solicitors, supply chain managers, public sector workers)
Problem Mapping Workshops
Facilitated sessions to distinguish root causes from symptomatic complaints
Cross-Sector Peer Review
Practitioners from adjacent domains validate whether analogous problems exist
03 · When it fails
Each failure has a research-led pivot, not just a stop.
Impossible Problem
No known solution pathway within 5-year horizon
→ Research alternative problems within same practitioner domain
Impractical Problem
Solution requires systemic change beyond capacity
→ Narrow scope to addressable sub-problem
Non-Urgent Problem
Cannot articulate consequences of non-resolution
→ Research what practitioners consider genuinely urgent
Gate threshold · PRL 1
Problem must score ≥60/100 on urgency-feasibility matrix to progress to PRL 2
01 · Success criteria
Is the problem articulated by practitioners in their operational context?
Right person · Practitioner (Daily User)
“Do you face this problem daily?”
Red-flag answer: Occasionally or Sometimes
02 · How the Townhouse helps
The convening activities that generate the evidence.
Knowledge Transfer Roundtables
Structured problem surfacing sessions convening cross-sector practitioners (NHS clinicians, teachers, solicitors, supply chain managers, public sector workers)
Problem Mapping Workshops
Facilitated sessions to distinguish root causes from symptomatic complaints
Cross-Sector Peer Review
Practitioners from adjacent domains validate whether analogous problems exist
03 · When it fails
Each failure has a research-led pivot, not just a stop.
Impossible Problem
No known solution pathway within 5-year horizon
→ Research alternative problems within same practitioner domain
Impractical Problem
Solution requires systemic change beyond capacity
→ Narrow scope to addressable sub-problem
Non-Urgent Problem
Cannot articulate consequences of non-resolution
→ Research what practitioners consider genuinely urgent
Gate threshold · PRL 1
Problem must score ≥60/100 on urgency-feasibility matrix to progress to PRL 2
01 · Success criteria
Does the problem persist across a statistically meaningful practitioner cohort?
Right person · Practitioners (Sector Cohort)
“Is this a sector-wide problem or just your organisation?”
Red-flag answer: Only 1-2 organisations face it
02 · How the Townhouse helps
The convening activities that generate the evidence.
Discovery Sprints
8-hour on-site immersion with practitioners in operational environment
Cross-Sector Validation Panels
Practitioners from multiple organisations convene to triangulate problem prevalence
Workflow Documentation
Systematic mapping of current-state processes to identify pain point frequency and impact
03 · When it fails
Each failure has a research-led pivot, not just a stop.
Niche Problem
<10 practitioners; highly specific context
→ Narrow to specialist segment OR research broader adjacent problems
Perception-Reality Gap
Practitioners report problem but observation contradicts
→ Research underlying frustrations driving perception
Low-Consequence Problem
Problem exists but creates minimal operational impact
→ Research high-consequence problems in same domain
Gate threshold · PRL 2
Problem must achieve ≥65/100 on prevalence-impact scoring to progress to PRL 2.5
01 · Success criteria
Will practitioners allocate time and organisational permission to test potential solutions?
Right person · Practitioners (Pilot Participants)
“Will you commit 10+ hours over 2 weeks to test solutions?”
Red-flag answer: Maybe later or If we have time
02 · How the Townhouse helps
The convening activities that generate the evidence.
Pilot Commitment Workshops
Structured sessions where practitioners co-design pilot scope, timeline, and success metrics
Organisational Alignment Sessions
Engagement with operational managers to secure time allocation and remove barriers
Pre-Pilot Risk Assessment
Practitioners identify what could prevent participation, enabling mitigation planning
03 · When it fails
Each failure has a research-led pivot, not just a stop.
Low Priority
Won't commit time = problem insufficiently urgent
→ Research what practitioners WOULD prioritise; reframe or pivot
Organisational Barriers
Practitioners willing but managers block participation
→ Research organisational change readiness; build stakeholder buy-in first
Risk Aversion
Practitioners fear pilot disruption to service delivery
→ Research lower-risk pilot designs; increase organisational safety protocols
Gate threshold · PRL 2.5
Minimum 5 committed practitioners with organisational approval to progress to PRL 3
01 · Success criteria
Is there demonstrable willingness-to-pay from both individual practitioners and institutional budget holders?
Right person · Customer (Pays) + 12 Stakeholders
“Will you pay £X today to fix this?”
Red-flag answer: Let me think or After v2
02 · How the Townhouse helps
The convening activities that generate the evidence.
Demand Validation Panels
Practitioners and finance/procurement teams jointly assess value proposition
Willingness-to-Pay Testing
Structured pricing research with both user and buyer personas
Budget Pathway Mapping
Working sessions with finance teams to identify funding mechanisms (capital vs operational budgets, innovation funds, charitable grants)
03 · When it fails
Each failure has a research-led pivot, not just a stop.
No Economic Pull
Practitioners want solution free but won't advocate for budget
→ Research alternative funding models OR redesign value proposition
User-Buyer Misalignment
Users value highly but budget holders see no ROI
→ Research how to demonstrate ROI in buyer's language; build business case
Unsustainable Economics
Unit costs exceed willingness-to-pay by >3x
→ Research cost reduction pathways OR pivot to higher-value use case
Gate threshold · PRL 3
Minimum dual-segment validation (≥30% small entity + 1 institutional LOI) OR single-segment validation at 50%+ to progress to Experiment stage
01 · Success criteria
Does a non-technical solution approach achieve baseline efficacy in real practitioner workflows?
Right person · Supply Chain + Academics
“Can we source, build, deliver this reliably?”
Red-flag answer: Can't source materials or Impossible
02 · How the Townhouse helps
The convening activities that generate the evidence.
Stress Test Track A
Practitioner-led paper prototyping and "Wizard of Oz" testing (manual backend simulating automated system)
Academic Modelling
University research partners model workflow impact using discrete event simulation or systems dynamics
War Room Sessions
Practitioner cohorts challenge solution under adversarial conditions to identify failure points
03 · When it fails
Each failure has a research-led pivot, not just a stop.
Idea-Functionality Gap
Even without tech constraints, approach doesn't solve problem
→ Research fundamental flaws in solution logic; redesign from first principles
Unrealistic Expectations
Practitioners expect outcomes solution cannot deliver
→ Research achievable outcomes; reset expectations OR pivot to solution that CAN deliver
Workflow Incompatibility
Solution requires workflow changes practitioners cannot/will not make
→ Research workflow-compatible alternatives OR change management requirements
Gate threshold · PRL 4
≥70% task completion + practitioner confidence score ≥75/100 to progress to PRL 5
01 · Success criteria
Does the digital minimum viable product (MVP) integrate seamlessly into real operational workflows?
Right person · Practitioner (Daily User)
“Does this save you 2+ hours per week?”
Red-flag answer: Maybe or I'd try it
02 · How the Townhouse helps
The convening activities that generate the evidence.
Stress Test Track B
Co-design sprints with practitioner-researcher-technologist triads
Real-World Integration Testing
MVP deployed in operational environment (not simulation)
Iterative Refinement Cycles
Weekly feedback loops with rapid prototyping responses
03 · When it fails
Each failure has a research-led pivot, not just a stop.
Tech-Workflow Mismatch
Digital solution works in isolation but breaks practitioner processes
→ Research UX/UI redesign with practitioner input; simplify interaction model
Adoption Friction
Learning curve exceeds time saved; practitioners revert to old methods
→ Research simpler technical approach OR enhance training/onboarding
Infrastructure Barriers
MVP requires IT infrastructure practitioners don't have access to
→ Research infrastructure-light alternatives OR build infrastructure business case
Gate threshold · PRL 5
≥80/100 on workflow integration score + measurable efficiency gain to progress to PRL 6
01 · Success criteria
Would practitioners immediately adopt if solution were available today, and would they resist its removal?
Right person · Frontline Operator + Market
“Would you fight to keep this tool?”
Red-flag answer: Silence, shrugs, or It's okay
02 · How the Townhouse helps
The convening activities that generate the evidence.
Validation Gate Review
Practitioner-led decision board with multi-stakeholder representation
Red Team Challenge
Designated devil's advocate practitioners test solution under worst-case scenarios
Champion Identification
Practitioners who volunteer to advocate for adoption within their organisations
03 · When it fails
Each failure has a research-led pivot, not just a stop.
"Nice But Not Essential"
Practitioners like solution but won't fight for budget/adoption
→ Research what would elevate to "must have"; add killer feature OR pivot segment
Champion Fatigue
Initial enthusiasm wanes; practitioners disengage
→ Research motivational barriers; build reward structures OR improve solution stickiness
Competitive Alternative
Practitioners prefer existing solution or competitor
→ Research competitive advantage gap; differentiate OR acknowledge market position
Gate threshold · PRL 6
NPS ≥80 + TVR ≥10 + ≥3 identified champions to progress to Build stage
01 · Success criteria
Are practitioner champions actively mobilising internal resources and peer networks for adoption?
Right person · Internal Champion
“Does your team need this yesterday to win?”
Red-flag answer: Nice to have or Eventually
02 · How the Townhouse helps
The convening activities that generate the evidence.
Practitioner-Led Development
Champions embedded in development team with voting rights on feature prioritisation
Research Integration
Knowledge Transfer Partnership (KTP)-accredited academics embedded to maintain methodological rigour
Champion Network Formalisation
Structured peer support network with defined roles (lead users, beta testers, ambassadors)
03 · When it fails
Each failure has a research-led pivot, not just a stop.
Champion Burnout
Initial enthusiasm fades without organisational recognition
→ Research incentive structures; formalise champion role with protected time
Organisational Resistance
Champions face institutional barriers despite personal commitment
→ Research change management requirements; build stakeholder coalition
Isolation
Single champion per organisation = fragile adoption
→ Research champion network effects; recruit multiple champions per organisation
Gate threshold · PRL 7
≥3 active champions + ≥2 organisational commitments to progress to PRL 8
01 · Success criteria
Is the solution embedded within operational practice across multiple organisations with demonstrable sustainability?
Right person · Community (Peer Network)
“Would you recommend this to peers?”
Red-flag answer: <30% referral rate
02 · How the Townhouse helps
The convening activities that generate the evidence.
Practitioner-Led Pilot Expansion
Champions lead new site onboarding (not vendor-led rollout)
Regional Cluster Activation
Geographic and sectoral hubs established for peer support
Training Curriculum Development
Practitioner-authored training materials and certification pathways
03 · When it fails
Each failure has a research-led pivot, not just a stop.
Scaling Breaks Quality
Solution performs well with 10 users, degrades at 100+
→ Research technical architecture limitations; redesign for scale OR remain boutique
Support Infrastructure Gap
User base grows faster than support capacity; satisfaction declines
→ Research support model; build tiered support OR slow expansion
Economic Model Failure
Costs scale linearly but revenue doesn't; unsustainable unit economics
→ Research pricing model; increase willingness-to-pay OR reduce cost structure
Gate threshold · PRL 8
≥100 users + 90% retention + 30% referral + operational embedding evidence to progress to PRL 9
01 · Success criteria
Has the solution achieved sector standard status with measurable ecosystem effects?
Right person · Market + Customer
“Is this becoming sector standard?”
Red-flag answer: No ecosystem effects visible
02 · How the Townhouse helps
The convening activities that generate the evidence.
Practitioner Alumni Network
Formalised community with governance structures
IP Licensing Strategy
Open innovation models enabling derivative works and adaptations
Innovate UK Case Study Publication
Documented evidence for national innovation policy
National Standards Working Groups
Participation in sector-wide standardisation efforts
03 · When it fails
Each failure has a research-led pivot, not just a stop.
Plateau at Early Majority
Cannot cross chasm from early adopters to mainstream
→ Research mainstream barriers; partner with sector institutions OR accept niche dominance
Regulatory Capture
Policy/regulatory changes create barriers to continued adoption
→ Research policy advocacy requirements; build regulatory relationships
Technological Obsolescence
New technologies render solution approach outdated
→ Research next-generation architecture; plan sunset or evolution pathway
Gate threshold · PRL 9
Community formation + professional body adoption + policy influence + ecosystem effects = PRL 9 achieved
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 8 of 18
PRL Present · Walk through the PRL · 45 activities · effect size · tiers
Slide 9 of 18 · The evidenceWhich validation activities actually predict adoption?
TakeawayMoney, retention, budget and daily use beat surveys, likes, press and pitch wins.
Exceptionally strong signal
Top 5% predictors
Strong signal
Top 15% predictors
Moderate signal
Above-average predictors
Weak signal
Below-average predictors
Negligible / noise
Poor predictors
01 · League table · effect size
Rank 1 of 45 · PRL 9
Paying customer with signed contract
1.05
Exceptionally strong signal · Top 5% predictors
Effect sizes and evidence as given in the UKBT Institute PRL framework app; confirm sources before publishing.
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 9 of 18
PRL Present · Walk through the PRL · Vanity signals · Hard signals · Gate thresholds
Slide 10 of 18 · The evidenceWhat do founders chase that doesn't count, and what should they do instead?
TakeawayEvery gate needs a minimum number of hard signals: 2, then 4, 6, 8 and 10 of 10.
01 · Anti-patterns
Low-traction activities that feel like progress, and the hard signal to chase instead.
Survey "Would you use this?"
Why founders do it: Easy to execute; feels like validation
Why it fails: 90% intention-action gap; courtesy bias
→ Get £100 pre-sale commitment
Pitch competition circuit
Why founders do it: Validation theatre; trophy hunting
Why it fails: Judges ≠ customers; 5% correlation with success
→ Get paying customer
Building more features
Why founders do it: Feels productive; avoids customer facing
Why it fails: Feature bloat kills usability; ES 0.07
→ Get daily use without prompting
Social media likes/follows
Why founders do it: Dopamine hit; vanity metrics
Why it fails: <1% correlation with revenue
→ Get 30% referral rate
Advisory board (non-customers)
Why founders do it: Looks impressive; credential collecting
Why it fails: Advisors give opinions not money; ES 0.36
→ Get champion who mobilizes budget
Press coverage hunting
Why founders do it: Ego boost; "awareness"
Why it fails: 3% conversion; awareness ≠ demand
→ Get 90% retention
02 · Traction thresholds at each gate
| PRL gate | Hard signals needed | Required activities | Pass criteria |
|---|---|---|---|
| PRL 1–3 | 2 of 10 |
| ≥60/100 + 11/12 stakeholder YES |
| PRL 4–6 | 4 of 10 |
| ≥80/100 + NPS ≥80 + TVR ≥10 |
| PRL 7 | 6 of 10 |
| ≥90/100 + ≥1 case study |
| PRL 8 | 8 of 10 |
| ≥90/100 + 7% WoW growth |
| PRL 9 | 10 of 10 |
| Commercial validation complete |
Hard signals are the ten exceptionally strong activities (effect size ≥0.80) at the top of the league table.
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 10 of 18
PRL Present · Walk through the PRL · Signal · Meaning · Action
Slide 11 of 18 · The gatesWhich answers should stop a project, and what do we do next?
TakeawayA red flag is an automatic gate failure: pivot or kill.
The rule
Any red flag at its designated PRL level = automatic gate failure.
Each red flag triggers an immediate pivot or kill decision, before more money is spent.
Definition
A red flag is any validation answer indicating insufficient problem urgency, impact or adoption intent.
| PRL stage | Red-flag signal | What it means | Immediate action |
|---|---|---|---|
| PRL 1–2 | “Occasionally / Sometimes” | Low frequency; not urgent; not top-3 pain | KILL or pivot to higher-frequency problem |
| PRL 2.5 | “Maybe later / If we have time” | No commitment; low priority | KILL or find practitioners with urgency |
| PRL 3 | “Let me think / After v2” | No willingness-to-pay; speculative interest | KILL or pivot value proposition |
| PRL 3 | “Too early / Too late” | Market timing wrong | KILL or wait for market readiness |
| PRL 4 | “Can't source / Impossible” | Technical/supply chain impossibility | KILL or research alternative approaches |
| PRL 5 | “Maybe / I'd try it” | Marginal benefit; insufficient impact (<2 hours/week) | Redesign for 10x impact or KILL |
| PRL 6 | “Silence / Shrugs / It's okay” | Not mission-critical; won't defend it | KILL; will never achieve adoption |
| PRL 7 | “Nice to have / Eventually” | No urgency; won't mobilize budget | KILL or find different champion segment |
| PRL 8 | “<30% referral rate” | Poor product-market fit; retention will collapse | Fix core value proposition or KILL |
| PRL 9 | “No paying customers” | Business model broken; no commercial validation | Pivot business model or KILL |
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 11 of 18
PRL Present · Walk through the PRL · Dimensions · Weights · Thresholds
Slide 12 of 18 · The scoresHow is readiness scored?
TakeawayFive weighted dimensions; the pass mark rises 60 → 80 → 90.
| Dimension | Weight | Measurement method | Gate threshold |
|---|---|---|---|
| Adoption Intent | 35% | Pre-sale conversion, NPS, switch quotient, 'fight to keep it' responses | PRL 1-3: ≥60 PRL 4-6: ≥80 PRL 7-9: ≥90 |
| Workflow Integration | 30% | Time saved (≥2 hours/week), error reduction, task completion rate | All stages: measurable improvement |
| Champion Advocacy | 20% | Number of champions, budget mobilization ability, peer recruitment | PRL 7+: ≥3 champions |
| Economic Signal | 10% | Willingness to pay today, LTV:CAC ratio, unit economics validation | PRL 3: £100 pre-sale or LOI PRL 9: Paying customer |
| Ecosystem Momentum | 5% | Referral velocity (≥30%), community formation, policy influence | PRL 8-9: Active community |
01 · Weighting
Out of 100 points.
Score = Σ (dimension score × weight). Adoption and workflow make up 65%: the model rewards use, not interest.
02 · Gate pass requirements
Later stages demand stronger evidence.
PRL 1–3
≥60/100
+ 11/12 stakeholder YES
PRL 4–6
≥80/100
+ no red flags
PRL 7–9
≥90/100
+ 7% week-on-week growth + no red flags
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 12 of 18
PRL Present · Walk through the PRL · Time · Errors · Satisfaction · Referral
Slide 13 of 18 · The scoresDoes the technology make daily work measurably better?
TakeawayTVR ≥ 10 is required to pass PRL 6.
Scale · threshold
1–20 scale
TVR ≥ 10 required at PRL 6
What it measures
A composite rating of practitioner value across four weighted dimensions. It answers: does this technology make daily work measurably better, enough that people would recommend it?
| Component | Weight | Measurement | Target |
|---|---|---|---|
| Time efficiency gain | 40% | Hours saved per week per practitioner | ≥2 hours/week |
| Error/rework reduction | 30% | % reduction in errors or rework cycles | ≥20% reduction |
| Practitioner satisfaction | 20% | NPS score from daily users | ≥80 |
| Peer recommendation intent | 10% | Would you recommend to colleagues? | ≥80% yes |
01 · Worked example
Each component scores 10 when it exactly meets its target (capped at 20). TVR is the weighted sum, so 10 means ‘targets met on average’.
Time efficiency gain
Measured 3 hours/week · target ≥2 hours/week
15.0 × 40% = 6.00
Error/rework reduction
Measured 25 % reduction · target ≥20% reduction
12.5 × 30% = 3.75
Practitioner satisfaction
Measured 82 NPS · target ≥80
10.3 × 20% = 2.05
Peer recommendation intent
Measured 85 % yes · target ≥80% yes
10.6 × 10% = 1.06
TVR = 6.00 + 3.75 + 2.05 + 1.06
12.9 ≥ 10 ✓
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 13 of 18
PRL Present · Walk through the PRL · TRL milestones · Block rules · Gates
Slide 14 of 18 · The governanceHow far may technology go before practitioners catch up?
TakeawayPRL must lead or equal TRL. TRL 6 is a hard gate.
01 · Minimum PRL by TRL
Technology may only climb as far as practitioners have validated.
Critical integration principle
PRL must lead or equal TRL at all times.
TRL answers “can we build it?” PRL answers “should we build it?”
02 · Governance rule
Block rules applied at each technology milestone.
| TRL milestone | Min PRL | Enforcement rationale | Block rule |
|---|---|---|---|
| TRL 1-3Laboratory Research | PRL 1-2 | Problem must be practitioner-validated before lab work | Cannot start TRL 1 if PRL <1 |
| TRL 4-5Prototype Development | PRL 4-5 | Cannot develop tech prototype until analogue solution works | Cannot start TRL 4 if PRL <4 |
| TRL 6Demonstration | PRL ≥5 | No technology demonstration without real-world utility validation | HARD GATE: TRL 6 BLOCKED if PRL <5 |
| TRL 7-8Pilot/Production | PRL 7+ | Cannot enter production without documented practitioner impact | Cannot start TRL 7 if PRL <7 |
| TRL 9Commercial Deployment | PRL 8-9 | Cannot scale commercially without sustained multi-site adoption | Cannot reach TRL 9 if PRL <8 |
03 · Three-framework gates
At each milestone all three readiness levels must be met.
| Milestone | TRL | CRL | PRL | Rule |
|---|---|---|---|---|
| Concept validation | TRL 1–2 | CRL 1–2 | PRL 1–3 | 11/12 stakeholder YES or KILL |
| Prototype development | TRL 4 | CRL 3–4 | PRL 4 | All 3 frameworks or KILL |
| ⚠ Demonstration gate | TRL 6 | CRL 5 | PRL ≥5 | HARD GATE: cannot proceed if any is below threshold |
| Pilot / trial | TRL 7–8 | CRL 6–7 | PRL 7 | All 3 frameworks or KILL |
| Commercial launch | TRL 9 | CRL 8–9 | PRL 8–9 | All 3 at level 9 = sustainable success |
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 14 of 18
PRL Present · Walk through the PRL · 13 failure types · TRL · CRL · PRL
Slide 15 of 18 · The evidenceWhich failures does each framework catch, and how early?
TakeawayPRL catches every failure mode, in parallel and early.
TRL catches
1/13
+1 partially
CRL catches
3/13
+7 partially
PRL catches
13/13
All failure modes, in parallel
| Failure type | TRL | CRL | PRL catches at | How | Cost saved |
|---|---|---|---|---|---|
| Technical impossibility | ●Catches TRL 1–4 | ○Misses Misses | ●Catches PRL 1–4 | Academics + technologists in the Townhouse | £500K–£2M (95% reduction) |
| Market doesn't exist | ○Misses Misses | ●Catches CRL 2–4 | ●Catches PRL 2–3 | Practitioner cohort validation (≥10 required) | £200K+ (weeks vs months) |
| Poor business model | ○Misses Misses | ●Catches CRL 7–9 | ●Catches PRL 3, 6, 7, 9 | 12-stakeholder economic stress test | £500K–£1M+ (95% reduction) |
| Practitioners won't adopt | ○Misses Misses | ◐Partially Partial | ●Catches PRL 5–9 | Direct end-user validation; retention tracking | Core PRL purpose |
| Lab-to-field gap | ◐Partially TRL 5–6 | ○Misses Misses | ●Catches PRL 4–5 | Analogue pilots before tech build | £200K+ (prototype avoided) |
| Regulatory barriers | ○Misses Misses | ◐Partially CRL 6–7 | ●Catches PRL 3 | Lawyers identify early in the Townhouse | £2M+ (2–3 years earlier) |
| Hidden costs kill margins | ○Misses Misses | ◐Partially CRL 8 | ●Catches PRL 3 | Finance/procurement expose TCO | £500K–£1M+ (before build) |
| Can't mobilise budget | ○Misses Misses | ◐Partially CRL 6–7 | ●Catches PRL 6–7 | Champion advocacy test; budget holder validation | £750K+ (18–24 months earlier) |
| Wrong customer segment | ○Misses Misses | ◐Partially CRL 5–6 | ●Catches PRL 2–3 | Practitioner vs budget holder clarity | £300K+ (12–18 months earlier) |
| Pricing model broken | ○Misses Misses | ●Catches CRL 5–7 | ●Catches PRL 3 | Economic signal test; willingness-to-pay | £200K+ (6–12 months earlier) |
| Procurement barriers | ○Misses Misses | ◐Partially CRL 6–7 | ●Catches PRL 3 | Procurement specialists in the Townhouse | £500K+ (12–24 months earlier) |
| Sales cycle kills runway | ○Misses Misses | ◐Partially CRL 6–7 | ●Catches PRL 3 | Budget cycle mapping with finance | Prevents fatal cash crisis |
| Adoption fatigue | ○Misses Misses | ○Misses Misses | ●Catches PRL 8 | 90% retention metric; 30% referral tracking | Unique to PRL |
● Catches◐ Partially○ MissesFigures from the FORTRESS PRL framework v2.0
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 15 of 18
PRL Present · Walk through the PRL · Cost-benefit · Impact targets
Slide 16 of 18 · The evidenceWhat does practitioner-led validation save?
Takeaway£10K–£20K in weeks, versus £1M+ over years.
01 · Cost-benefit
Validating with all three frameworks in parallel, in the Townhouse.
TRL only
Technical issues only
Timeline
12–18 months
Investment
£500K–£2M
TRL + CRL
Technical + commercial (sequential)
Timeline
18–36 months
Investment
£1M–£3M
TRL + CRL + PRL
All issues (parallel)
Timeline
1–4 weeks
Investment
£10K–£20K
02 · UK R&D impact targets
FORTRESS + PRL targets against the UK baseline.
Projects reaching production
Adoption post-launch
Overall failure rate
Average failure cost
Baseline £500K+
£9K (kill fee)
Patents per £1M R&D
Baseline 1
10
Time to PRL 6 validation
Baseline N/A
8 weeks
These are programme targets from the FORTRESS PRL framework, not measured outcomes.
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 16 of 18
PRL Present · Walk through the PRL · UK integration · Definitions
Slide 17 of 18 · The contextHow does PRL fit existing UK R&D frameworks?
TakeawayPRL plugs into TRL, IRL, Stage-Gate, KTP, Catapults and Smart Grants.
| Framework | PRL integration point | Strategic alignment |
|---|---|---|
| TRL (NASA/ESA) | PRL–TRL parity rule enforced | Prevents technology-push failures |
| IRL (Innovate UK) | PRL 6 = IRL 4 (market-validated traction) | Bridges lab-to-market transition |
| Stage-Gate (Cooper) | PRL 1–3 = Gate 0; PRL 4–6 = Gates 1–2; PRL 7–9 = Gates 3–5 | Enhances existing portfolio management |
| Innovate UK Smart Grants | PRL 5+ required for Catapult acceleration | Public funding tied to practitioner validation |
| KTP | PRL 7+ enables practitioner–academic co-supervision | Academic validation embedded in scale |
| Catapult Network | PRL 4–6 testing infrastructure; PRL 7+ scale-up support | Leverages national infrastructure |
01 · Core definitions
Practitioner
The operational end user who directly interacts with the technology in their professional workflow (not the budget holder or IT implementer, unless they are also the daily user).
Champion
A practitioner who uses the solution ≥4× a week, recruits ≥2 peer users and advocates for budget allocation.
Townhouse
FORTRESS R&D's multi-stakeholder convening space where 12 diverse stakeholder types validate innovations through collaborative stress testing.
Red flag
Any validation answer indicating insufficient problem urgency, impact or adoption intent. It triggers an immediate pivot or kill decision.
In one line
“Never skip a voice. Test simple before tech. Co-create, don't dictate. Share everything.”
Technology readiness answers ‘Can we build it?’ Practitioner readiness answers ‘Should we build it?’ The latter is the more fundamental question for UK R&D excellence.
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 17 of 18
PRL Present · Walk through the PRL · Game · Red flags · Evidence
Slide 18 of 18 · PlayCan you tell real practitioner pull from polite interest?
TakeawaySpot the red flag, then spend your runway on hard signals, not vanity.
The Townhouse Climb
Take an idea up the building.
You have learned the model. Now use it. Ten gates, from PRL 1 to PRL 9: at each one you interview a practitioner and decide where to spend your limited runway.
Start the climb →1 · Spot the red flag
Three practitioners answer the gate question. Which answer should stop you?
2 · Spend your runway
Pick the activities to chase. Hard signals clear the gate; vanity metrics don't.
Prefer to go deeper?
Walk a worked case study through every gate, or enter your own innovation.
Notes
UKBT Institute · PRL Present · FORTRESS R&D · Walk through the PRL · Slide 18 of 18